STG residential complex

строительствоJM Capital

Solution

  • Modular block design, 18×7 m
  • Steel frame + sandwich panels

Parameters

  • Capacity 5.55 MW
  • 3 water-heating boilers METEOR, SK 755-1850 (1850 kW)
  • Gas burner CIB Unigas (Italy)
  • Pumps Ratsional (Russia)
  • Booster pumping station for hot-water supply, CNP (China)
  • Chimney with a supporting structure, H=6 m (Craft)

Result

  • Reliable autonomous heat supply
  • Lower engineering-infrastructure costs
  • Shorter project timeline
  • Energy-efficient operation

Get a commercial proposal

Describe your task — an engineer will contact you, visit the site if needed and prepare an accurate commercial proposal

We'll select the optimal equipment
We'll answer all your questions
We'll prepare a full cost estimate